Philippines Smart Microgrids Power Project

Infunde Development - Infrastructure DevelopmentUncategorized Philippines Smart Microgrids Power Project

Philippines Smart Microgrids Power Project

In the Philippines, there are 2.5 million off-grid households which are to be electrified by 2022 according to national electrification targets. More than 50% of these households are in ‘unviable areas’ or ‘missionary areas’. According to Missionary Electrification Development Plan 2016-2020, ​over 700,000 households are known to be in these unviable areas​ ​and are currently unelectrified​.Text to add here

Country and Sectoral Background

In the Philippines, there are 2.5 million off-grid households which are to be electrified by 2022 according to national electrification targets. More than 50% of these households are in ‘unviable areas’ or ‘missionary areas’. According to Missionary Electrification Development Plan 2016-2020, ​over 700,000 households are known to be in these unviable areas​ ​and are currently unelectrified​.

 

Infunde Development, on behalf of InfraCo Asia, will lead the development of the Philippine Smart Microgrids Project that aims to demonstrate the opportunity in rapid electrification of off-grid communities by utilizing smart microgrids under a business model leveraging local distribution partners.

The Project

The Island Cooperative Solar Power Solution project will provide 24/7 access to electricity to off-grid areas in the Philippines through smart grid controller along with off-the-shelf solar and battery components. The first phase of the project involves developing and installing a microgrid project of up to 100 households (0.02MW) across two site locations in Busuanga, Palawan. After successful implementation of the first phase, Infunde will proceed with expansion to 8,000 households in Phase 2 with a local partner

Download Philippines Smart Microgrids Power Project

Overview

Company: TBD

Country: Philippines

Region: Palawan


Sector: Solar Power Energy (microgrid with battery)

Size: 1.2 MW

Status: In development

Timeline:
Expected financial close: Q4 2020

Capex: $4.94M

IAD Funding Committed:

Other Shareholder(s): InfraCo Asia

Suppliers: TBD

Development Impact:
• 40,500 people will have improved access to infrastructure services
• 200 short-term jobs (during the construction)